2010-Apr-17 - Wooroloo - Workshop #4
I was convinced that 10 minutes of levelling and a total of 3 hours work would be required to install the tank drainage pipe.(Peter had just about done everything last week)

Well Max reckoned it would all take a lot longer than this and proceeded to take 3 hours to finalise the levels and the whole day to not finish the job.

A beautifully done job and he worked very hard all day - but so long to do it.


Backfilling the trench after laying extra pipes

Shovelling clean sand for the back fill