2008-Nov-1 - Wooroloo - Floor Laying Week #4
Worked all Saturday and Sunday

Managed to lay another 2 metres of floor.

Done 5.1 metres total so far - not even halfway there (total of 12.6m) - will this job ever end ?

At least I'm past the large structural beam in the carport area and just about up to the stairwell beam in the laundry area.

Almost time to lay another 3 sets of roofing frames - the black plastic is barely covering the floorboards at the moment.


Looking from Ian's end

Looking from Ross's end

Allowance for column sockets

Still a long way to go

All tucked up under plastic and temporary roof